Contact us Partner portal

Care-home connectivity migration

A care home runs several different systems over what looks like one set of phone lines. Migrating them off analogue has to treat telecare, voice and administration as separate problems, because they fail in very different ways.

Sector guides

Three systems, three migrations

It is tempting to treat a care home as one connection to move, but the systems behind it have very different stakes. Telecare, the nurse-call and personal alarms that residents depend on, is safety-critical and has to keep working, including in a power cut. Staff voice matters for coordination but fails more gracefully. Administrative systems matter for the business but can tolerate a short outage. Building a single migration plan for all three hides the fact that telecare needs the most care, the most testing and the clearest fallback.

Make a separate dependency and acceptance record for each. For telecare in particular, the device compatibility and the standards it meets are a specialist matter, and the care operator and device supplier have to be part of the decision, not just the telecoms provider.

Coordinate the suppliers, phase the move

A care-home migration involves the care operator, the telecare device supplier and the connectivity provider at once, so it works best phased rather than switched in one go. Move and prove the less critical systems first, keep telecare until its compatibility and backup power are confirmed and witnessed, and keep a fallback until each step is accepted.

Netavo provides connectivity, voice and critical-path services that can underpin a phased migration. Netavo provides the connectivity; telecare-device compatibility and certification remain with the care operator and the device supplier, so involve them at each step.

Common questions

Why not migrate a care home in one step?

Because telecare, staff voice and admin systems have very different criticality. Telecare is safety-critical and needs the most testing and a clear fallback; a single plan for all three understates that. Phase the move and prove each separately.

Does telecare keep working in a power cut after migration?

Only if it is designed to. Analogue lines often carried power; an IP path usually does not. Confirm and test backup power for telecare specifically before relying on it.

Who confirms telecare device compatibility?

The care operator and the telecare device supplier, with specialist review. The connectivity provider supplies the path; suitability is a joint, verified decision, not an assumption.

Migrating a care home off analogue?

Tell us about your sites and systems, and an engineer will help separate and phase the migration.

Work with us →